Cayman Turtle Farm, Caribbean

This marine park acrylic panel installation brought American Sealants Inc. to the Cayman Turtle Centre’s Predator Reef exhibit, home to nurse sharks, tarpon, and other predatory species. ASI’s team handled the acrylic panel installation along with epoxy coating and sanding and polishing work.

The installation wasn’t without its challenges: daily rain, mud, and on-site fabrication all had to be managed along the way. All in all, it was a great project, and Cayman Turtle Centre’s guests love it.

Guests arrive at the Cayman Turtle Farm to an array of experiences. One of those experiences is encountering sharks and eels face-to-face. The 1.3 million-gallon saltwater lagoon has three fourteen-foot acrylic panels installed by American Sealants Inc. The American Sealants Inc. team completed installation of acrylic panels, epoxy coating, and sanding & polishing. There was many challenges during this project. Daily rain, mud as well as on-site fabrication that had to take place. All in all, it was a great project and the guests love it!

https://www.turtle.ky